Buyer summary
MyCabin My Kalmus is a 15.0 m² timber frame listing from MyCabin Global. Price is listed as €17,950; layout is 0 bed / 0 bath. Ireland status: Evidence reviewed.
Trust & Ireland evidence
Why this supplier is listed
Public delivery, pricing, model, or company evidence has been checked by ourhouse.ie.
What we still need to check
Current quote, lead time, warranty, payment terms, delivery route, installation responsibilities, and Irish site suitability.
Factory review status
No factory report has been completed yet. Future factory-reviewed pages will disclose the visit date, inspector, paid status, photos, build notes, and limits.
Evidence note: 15m² workspace/studio. No bathroom.
Model snapshot
All-in cost on an Irish site
€40,800–€66,900 estimate, not a quote
How we get this range
| Factory price | €18,000 |
|---|---|
| VAT on an ex-VAT price | €4,100 |
| Transport to an Irish site | €2,600–€4,400 |
| Crane and delivery day | €1,200–€1,800 |
| Foundation | €2,500–€6,000 |
| Electricity, water and wastewater | €8,000–€20,000 |
| Drawings and planning | €1,500–€4,000 |
| Building Control and sign-off | €1,000–€2,500 |
| Contingency | 5–10% |
Low is an easy site with services nearby; high is a green-field site. Figures follow our pricing guide.
What the price includes: Foundation, installation, industrial preparation
Notes: 15m² workspace/studio. No bathroom.
Price scope
Included or stated: Foundation, installation, industrial preparation
Assume excluded until written into the quote: Confirm VAT, delivery, crane/offload, foundation or ground screws, service connections, planning/design fees, on-site assembly, snagging, and warranty route before paying a deposit.
Confirm before deposit
- Current price, VAT status, and currency.
- Exact delivery route to Ireland, offload method, and who pays if access is difficult.
- Foundation specification, service connections, and whether on-site assembly is included.
- Written warranty route and who handles defects after installation.
- Planning, building-regs, BER, fire-safety, and structural documents needed for your site.
- Deposit schedule, refund triggers, and named contracting entity.
