Buyer summary
Modularus Aria 33 is a 32.54 m² volumetric_modular listing from Modularus.lt (Modularus, UAB). Price is listed as €44,220; layout is 1 bed / 1 bath where captured. Ireland status: Evidence reviewed.
Trust & Ireland evidence
Why this supplier is listed
Supplier found and catalogued; evidence review is still in progress.
What we still need to check
Current quote, lead time, warranty, payment terms, delivery route, installation responsibilities, and Irish site suitability.
Factory review status
No factory report has been completed yet. Future factory-reviewed pages will disclose the visit date, inspector, paid status, photos, build notes, and limits.
Evidence note: 1-bed. Kitchen+living 17.26m², bedroom 9.76m², WC 3.52m², entrance 2m². Price from 970 EUR/m² (partial B) to 1,530 EUR/m² (full A++ holiday). Full finish Class B = 33×1,340 = ~€44,220. Class A = ~€45,210. Has completed Norway project (international). Ireland not mentioned — need to ask.
Model snapshot
Ireland-ready estimate: €50,820–€57,420. This is an ourhouse estimate where possible and should be confirmed before purchase.
What the price includes: full finish Class B (1,340 EUR/m²)
Delivery markets: international
Notes: 1-bed. Kitchen+living 17.26m², bedroom 9.76m², WC 3.52m², entrance 2m². Price from 970 EUR/m² (partial B) to 1,530 EUR/m² (full A++ holiday). Full finish Class B = 33×1,340 = ~€44,220. Class A = ~€45,210. Has completed Norway project (international). Ireland not mentioned — need to ask.
Price scope
Included or stated: full finish Class B (1,340 EUR/m²)
Assume excluded until written into the quote: Confirm VAT, delivery, crane/offload, foundation or ground screws, service connections, planning/design fees, on-site assembly, snagging, and warranty route before paying a deposit.
Confirm before deposit
- Current price, VAT status, and currency.
- Exact delivery route to Ireland, offload method, and who pays if access is difficult.
- Foundation specification, service connections, and whether on-site assembly is included.
- Written warranty route and who handles defects after installation.
- Planning, building-regs, BER, fire-safety, and structural documents needed for your site.
- Deposit schedule, refund triggers, and named contracting entity.
