Buyer summary
The Living is a 35 m² light gauge steel listing from Modular House. Price is listed as €75,350; layout is 1 bed / 1 bath. Ireland status: Ireland confirmed.
Trust & Ireland evidence
Why this supplier is listed
Public delivery, pricing, model, or company evidence has been checked by ourhouse.ie.
What we still need to check
Current quote, lead time, warranty, payment terms, delivery route, installation responsibilities, and Irish site suitability.
Factory review status
No factory report has been completed yet. Future factory-reviewed pages will disclose the visit date, inspector, paid status, photos, build notes, and limits.
Evidence note: evidence reviewed 2026-08-14 on the provider's garden-room page: 35 m² Living listed at €75,350.
Model snapshot
All-in cost on an Irish site
€94,700–€121,700 estimate, not a quote
How we get this range
| Factory price | €75,400 |
|---|---|
| Transport to an Irish site | €600–€900 |
| Crane and delivery day | €1,200–€1,800 |
| Foundation | €2,500–€6,000 |
| Electricity, water and wastewater | €8,000–€20,000 |
| Drawings and planning | €1,500–€4,000 |
| Building Control and sign-off | €1,000–€2,500 |
| Contingency | 5–10% |
Low is an easy site with services nearby; high is a green-field site. Figures follow our pricing guide. The published price is taken to include VAT.
What the price includes: Provider states one bedroom en suite with kitchen and bathroom included; confirm VAT and site works
Delivery markets: Ireland
Notes: evidence reviewed 2026-08-14 on the provider's garden-room page: 35 m² Living listed at €75,350.
Price scope
Included or stated: Provider states one bedroom en suite with kitchen and bathroom included; confirm VAT and site works
Assume excluded until written into the quote: Confirm VAT, delivery, crane/offload, foundation or ground screws, service connections, planning/design fees, on-site assembly, snagging, and warranty route before paying a deposit.
Confirm before deposit
- Current price, VAT status, and currency.
- Exact delivery route to Ireland, offload method, and who pays if access is difficult.
- Foundation specification, service connections, and whether on-site assembly is included.
- Written warranty route and who handles defects after installation.
- Planning, building-regs, BER, fire-safety, and structural documents needed for your site.
- Deposit schedule, refund triggers, and named contracting entity.
